| Date | July 2024 |
| Location | Thessaloniki |
FACADE
Dismantling of glazing
Dismantling of metal cladding on columns/parapet
Dismantling of plasterboard false ceiling
Collection and removal of dismantled materials
GROUND FLOOR
Dismantling of metal false ceiling
Dismantling of metal cladding around the door
Dismantling of a 6m² concrete step
Clean cutting of a 2.00m x 1.00m slab
Dismantling of an entrance hall
Dismantling of a wooden step/steel structure
Dismantling of plasterboard walls/suspended ceiling
Demolition of partition walls
Dismantling of plasterboard partitions between columns
Dismantling of plasterboard cladding ~20 m²
Dismantling of WC (sanitary ware – mirrors)
Collection and removal of dismantled materials/rubble
LOFT
Dismantling of plasterboard partition walls
Demolition of internal partition walls
Dismantling of internal window and door frames
Collection and removal of demolition waste and rubble