Ippokratio General Hospital

Project Details

Date 29/03/2019
Location Ippokratio General Hospital
Contractor Ergoschema EE Consortium – Axis Medical

Demolition work within hospital wards constitutes a specialised category of projects and requires technical expertise, professionalism and consistency.

Building A (3rd Floor)

  1. Demolition of 90m of partition walls2
  2. Mechanical cutting for openings and partitioning
  3. Dismantling of 24 internal glazed partitions.
  4. Dismantling of 5 cupboards – 62 internal window frames/doors.
  5. Dismantling of 43 external window frames.
  6. Removal of plasterwork and tiles from operating theatre surfaces: 100 m2
  7. Removal of vinyl flooring and underlay in the toilets: 897 m2 
  8. Removal of suspended ceiling made of metal mesh, 188 m2   
  9. Dismantling of sanitary ware and fittings in two toilets
  10. Dismantling of electrical and mechanical installations, air ducts & steam pipes in the skylights
  11. Dismantling of radiators
  12. Demolition of a concrete wall, slab and steps + thorough clearance of rubble
  13. Collection and removal of demolition waste using chutes