Demolition work within hospital wards constitutes a specialised category of projects and requires technical expertise, professionalism and consistency.
Building A (3rd Floor)
- Demolition of 90m of partition walls2
- Mechanical cutting for openings and partitioning
- Dismantling of 24 internal glazed partitions.
- Dismantling of 5 cupboards – 62 internal window frames/doors.
- Dismantling of 43 external window frames.
- Removal of plasterwork and tiles from operating theatre surfaces: 100 m2
- Removal of vinyl flooring and underlay in the toilets: 897 m2
- Removal of suspended ceiling made of metal mesh, 188 m2
- Dismantling of sanitary ware and fittings in two toilets
- Dismantling of electrical and mechanical installations, air ducts & steam pipes in the skylights
- Dismantling of radiators
- Demolition of a concrete wall, slab and steps + thorough clearance of rubble
- Collection and removal of demolition waste using chutes