GREMiSMATA are long-standing partners of Anatolia College in the field of demolition and dismantling.
In summary, the following work was carried out:
-
BUILDING COMPTON (GROUND FLOOR – 1st FLOOR)
- Removal of partition walls: 140 m²
- Dismantling of suspended ceiling comprising metal battens and mineral fibre: 460 m²
- Dismantling of vinyl flooring: 460 m²
- Dismantling of plasterboard walls 22m²
- Dismantling of glass blocks 24m²
- Dismantling of partition walls 30m²
- Dismantling of brick cladding 10m²
- Collection and removal of demolition waste
OUTDOOR AREA
- Removal of a 25m² tank slab using non-destructive cutting
- Collection and removal of rubble using a small crane