Our company undertook a series of demolition works, dismantling, clean cuts and hole drilling for the Ledra Marriott in Athens. In total, all the work took place from the mezzanine up to the 8th floor.
DEMOLITION
- Carpet removal
- Marble flooring removal
- Removal of window and door frames
- Removal of aluminium and glass curtain walls (balcony doors)
- Removal of marble parapet cladding (interior side)
- Dismantling of vertical marble cladding (external building wall)
- Collection and disposal of dismantled materials in the courtyard
DEMOLITION WORKS
- Demolition of load-bearing masonry
- Demolition of non-load-bearing masonry
- Demolition of dry-construction masonry
NON-DESTROYING CUTTING – HOLE DRILLING
- Non-destructive cutting of reinforced concrete
- Drilling of holes using a core drill