Demolition work in a hospital ward requires particular care to keep disruption to a minimum, and periodic maintenance is required to ensure the smooth running of the hospital.
In summary, the following work was carried out:
- Removal of load-bearing and non-load-bearing masonry
- Removal of mosaic tiling
- Dismantling of air ducts
- Dismantling of electrical and mechanical installations
- Cutting windows in masonry using a standard cutting disc
- Removal of vinyl flooring using a blowtorch
- Removal of glass blocks in operating theatres
- Collection and removal of demolition waste