AHEPA General Hospital, Thessaloniki

Project Details

Date 2019
Area Achepa
Contractor INSO SPA

Demolition work in a hospital ward requires particular care to keep disruption to a minimum, and periodic maintenance is required to ensure the smooth running of the hospital.

In summary, the following work was carried out:

  1. Removal of load-bearing and non-load-bearing masonry
  2. Removal of mosaic tiling
  3. Dismantling of air ducts
  4. Dismantling of electrical and mechanical installations
  5. Cutting windows in masonry using a standard cutting disc
  6. Removal of vinyl flooring using a blowtorch
  7. Removal of glass blocks in operating theatres
  8. Collection and removal of demolition waste