RESTAURANT

Removal of floor tiles + gross area 1,500 m²

Removal of suspended ceilings made of plasterboard, timber and metal – area 1.50 m²

Removal of stone cladding from perimeter walls & columns

(where deemed necessary)

Removal of plasterboard + battens

Dismantling of sideboards (10 items) – Electrical and mechanical works

Dismantling of 20 external window and door frames (arches + side panels)

Dismantling of internal window and door frames

Dismantling of 400 m² tiled roof (patio next to the footbridge)

Dismantling of flooring + screed, 160 m² x 0.10 m (between Cosmos and the pool bar)

Dismantling of 160 m² of plasterboard false ceilings (between Cosmos and the pool bar)

Dismantling of 4 external window frames (between Cosmos and the pool bar)

Removal and disposal of demolition waste/rubble to the courtyard

 

DISCOTEQUE

Removal of carpets – wooden platform

Removal of suspended ceilings

Dismantling of stone cladding

Dismantling of the bar

Dismantling of electrical and mechanical installations

Collection and disposal of demolition waste/rubble in the courtyard

 

ARCADE

Dismantling of 280 m² of soundproof ceiling

Dismantling of 280 m² of laminate flooring

Dismantling of aluminium/glass partitions

Dismantling of bar

Removal of concrete staircase using non-destructive cutting and a compressor

Non-destructive cutting of 2.00m x 2.00m slab + excavation of 3.2m³ shaft

Dismantling of 6+6 toilets (80 m²)

Dismantling of electrical and mechanical installations

Dismantling of external window and door frames

Dismantling of staircase (3 steps)

Dismantling of ramp

Collection and disposal of dismantled materials/rubble in the courtyard

 

SHOP PREMISES

Dismantling of suspended ceilings

Dismantling of floor tiles + grout

Dismantling of arches

Dismantling of external window and door frames

Dismantling of electrical and mechanical installations

Collection and disposal of dismantled materials/rubble in the courtyard

 

RECEPTION-LOBBY

Dismantling of 2 reception areas

Dismantling of plasterboard and timber false ceilings

Dismantling of electrical and mechanical installations

Dismantling of external window and door frames + upward widening

Dismantling of arches and columns

Dismantling of fireplace

Dismantling of bar

Dismantling of two shops

Dismantling of floor tiles + screed

Dismantling of wooden flooring

Dismantling of external flower beds/pyramid/pool pergola

Demolition of 20m of masonry + external wall + suspended ceiling in the corridor

Collection and disposal of demolition waste/rubble in the courtyard

Rubble clearance of a 100m² area

Protection of stone flooring with plywood ~ 800m²

 

CONFERENCE CENTRE

Removal of carpets

Removal of flooring + gross

Removal of plasterboard false ceilings

Dismantling of partition walls

Dismantling of external window and door frames

Dismantling of electrical and mechanical installations

Collection and disposal of dismantled materials/rubble in the courtyard