Project Details
| Date |
3 January 2020 |
| Area |
Filothei, Attica |
- Removal of built-in wardrobe
- Removal of floor tiles + gross
- Removal of internal door frames and doors
- Removal of wooden flooring
- Removal of toilet (tiles – sanitary ware)
- Kitchen dismantling (furniture – worktop tiles)
- Radiator dismantling
- Rubble removal and transport using chutes