From start to finish, we carry out the work with great attention to safety, whilst being environmentally friendly. During the works, we sort any recyclable materials so that they can be safely disposed of in the appropriate bins.
- Dismantling of two brick and clay chimneys
- Removal and transport of rubble
- Dismantling of a canopy (steel structure only)
- Demolition of partition walls approx. 50m2
- Demolition of external masonry 1.70m x 2.70m
- Dismantling of kitchen (furniture)
- Dismantling of bathroom (wall tiles – shower tray – sanitary ware – flooring)
- Dismantling of internal window and door frames – 7 items
- Dismantling of external window and door frames – 6 items
- Dismantling of wooden flooring (3 rooms)
- Removal of mosaic tiles and screed in the hallway / kitchen / under the canopy / balcony
- Removal of 3 built-in cupboards
- Removal of boiler / water tank
- Removal of plasterwork / radiators
- Removal of marble from the balcony parapet
- Removal of unwanted items
- Collection and removal of dismantled materials using a lifting machine