Flat in Vyronas, Attica

Project Details

Date 22 January 2019
Area Eastern Attica

Covering rubble collection bins with burlap helps to reduce dust.

In summary, the following work was carried out:

  1. Demolition of internal partition walls (corridor walls) covering approximately 30 m²
  2. Demolition of the bathroom loft and its extension into a bedroom and storage room
  3. Dismantling of the bathroom (tiles, flooring, sanitary ware)
  4. Dismantling of the hallway (mosaic + rough flooring)
  5. Dismantling of the kitchen
  6. Removal of kitchen floor tiles (tiles only)
  7. Removal of wooden flooring in 2 bedrooms
  8. Removal of 4 interior window frames
  9. Removal of arch above hall door
  10. Transport and disposal of demolition waste using chutes