Covering rubble collection bins with burlap helps to reduce dust.
In summary, the following work was carried out:
- Demolition of internal partition walls (corridor walls) covering approximately 30 m²
- Demolition of the bathroom loft and its extension into a bedroom and storage room
- Dismantling of the bathroom (tiles, flooring, sanitary ware)
- Dismantling of the hallway (mosaic + rough flooring)
- Dismantling of the kitchen
- Removal of kitchen floor tiles (tiles only)
- Removal of wooden flooring in 2 bedrooms
- Removal of 4 interior window frames
- Removal of arch above hall door
- Transport and disposal of demolition waste using chutes