  1. Demolition of 120m of rough-cast concrete2  x 0.18cm
  2. Removal of plasterboard partition walls
  3. Removal of plasterboard false ceiling
  4. Removal of wooden flooring
  5. Removal of floor tiles + grout
  6. Removal of wooden loft floor
  7. Removal of external window and door frames
  8. Removal of plasterboard cladding
  9. Cutting a door opening in a brick wall
  10. Dismantling a small canopy  
  11. Collection and removal of dismantled materials
  12. Removal of unwanted items – air duct

Ground floor

  1.  Dismantling of a small step
  2. Collection and removal of demolition waste
  3. Demolition of a bar
  4. Demolition of perimeter timber cladding
  5. Demolition of perimeter plasterboard cladding

Basement

  1. Dismantling of a bar
  2. Dismantling of wooden shelves
  3. Dismantling of plasterboard on 3 columns
  4. Removal of unwanted items
  5. Collection and removal of dismantled materials

Roof

  1. Dismantling of canopy & removal of 50cm of masonry
  2.  Dismantling of metal canopies
  3. Collection and removal of demolition waste