Holiday home in Epanomi

Project Details

Date 31/3/20
Area Epanomi, Thessaloniki

Breakdown of Works:

GROUND FLOOR

  1. Gross demolition
  2. Removal of internal window and door frames
  3. Removal of tiles
  4. Dismantling of plasterwork
  5. Dismantling of external window and door frames
  6. Demolition of partition walls
  7. Demolition of external curved wall section
  8. Demolition of external masonry at the entrance
  9. Enlargement of external window and door frames
  10. Collection and removal of demolition waste/rubble

 

BASEMENT

  1. Removal of floor tiles + grout
  2. Cutting a door opening in a brick wall
  3. Kitchen demolition
  4. Removal of partition walls
  5. Removal of staircase floor covering
  6. Removal of garage door
  7. Clearing of parking area
  8. Collection and removal of demolition waste/rubble

 

SURROUNDING AREA – ROOF

  1. Roof dismantling – 150m2
  2. Dismantling of all railings
  3. Dismantling of external cladding/tiles
  4. Dismantling of decorative brickwork from external surfaces
  5. Dismantling of wooden canopies in semi-open areas
  6. Demolition of a standing wall using non-destructive cutting
  7. Demolition of two gables using non-destructive cutting
  8. Dismantling of window sills
  9. Dismantling of industrial flooring in the rear area
  10. Collection and removal of dismantled materials/rubble