Project Details
| Date |
31/3/20 |
| Area |
Epanomi, Thessaloniki |
Breakdown of Works:
GROUND FLOOR
- Gross demolition
- Removal of internal window and door frames
- Removal of tiles
- Dismantling of plasterwork
- Dismantling of external window and door frames
- Demolition of partition walls
- Demolition of external curved wall section
- Demolition of external masonry at the entrance
- Enlargement of external window and door frames
- Collection and removal of demolition waste/rubble
BASEMENT
- Removal of floor tiles + grout
- Cutting a door opening in a brick wall
- Kitchen demolition
- Removal of partition walls
- Removal of staircase floor covering
- Removal of garage door
- Clearing of parking area
- Collection and removal of demolition waste/rubble
SURROUNDING AREA – ROOF
- Roof dismantling – 150m2
- Dismantling of all railings
- Dismantling of external cladding/tiles
- Dismantling of decorative brickwork from external surfaces
- Dismantling of wooden canopies in semi-open areas
- Demolition of a standing wall using non-destructive cutting
- Demolition of two gables using non-destructive cutting
- Dismantling of window sills
- Dismantling of industrial flooring in the rear area
- Collection and removal of dismantled materials/rubble