
| Date | February 2025 |
| Location | Edessa |
| Contractor | AXIS MEDICAL |
Dismantling of 110 m² of vinyl flooring
Dismantling of internal window frames and doors (27 items)
Dismantling of ceramic tiles ~80 m² + adhesive (not gross)
Demolition of brick partition walls (see drawing)
Cutting a hole in a slab measuring 0.90m x 1.00m using a non-destructive cutting method
Dismantling of three central air-conditioning units
Dismantling of 300 m² of metal mesh false ceilings
Removal of furniture
Collection and transport of demolition waste/rubble in the contractor’s skips