EDESSA GENERAL HOSPITAL

Project Details

Date February 2025
Location Edessa
Contractor AXIS MEDICAL

Dismantling of 110 m² of vinyl flooring

Dismantling of internal window frames and doors (27 items)

Dismantling of ceramic tiles ~80 m² + adhesive (not gross)

Demolition of brick partition walls (see drawing)

Cutting a hole in a slab measuring 0.90m x 1.00m using a non-destructive cutting method

Dismantling of three central air-conditioning units

Dismantling of 300 m² of metal mesh false ceilings

Removal of furniture

Collection and transport of demolition waste/rubble in the contractor’s skips