| Date | July 2023 |
| Area | Athens |
| Contractor | Private individual |
GENERAL
Demolition of 35m external building2 made of panels
Removal and transport of rubble to the interior
ROOF TERRACE
Dismantling of equipment (solar water heaters – air conditioning units – aluminium fittings)
Clearing of the site
Dismantling of the perimeter parapet cladding
Removal and transport of rubble
GROUND FLOOR
Dismantling of 110m of plasterboard partition walls2
Dismantling of 125m of plasterboard false ceiling2
Demolition of 60m of masonry2
Removal of furniture, equipment & unwanted items
Demolition of WC (floor tiles + adhesive – sanitary ware)
Dismantling of internal window and door frames (13 items)
Collection and removal of dismantled materials/rubble
BASEMENT – SURROUNDING AREA
Dismantling of partition panels 210m2
Dismantling of suspended ceiling 300m2
Removal of furniture, equipment & unwanted items
Removal of outdoor container fridges (2 units)
Collection and transport of demolition waste/rubble