BASEMENT

Dismantling of 18m² stone wall cladding on the staircase

Demolition of a 1.80m x 2.80m concrete wall using a diamond-tipped saw

Cutting a 3.20m × 2.80m opening in concrete using a diamond-tipped saw

Crushing, removal and transport of rubble

GROUND FLOOR

Demolition of concrete walls 1.60m x 2.90m (2 pieces) 12.2 square metres

Demolition of a concrete wall 3.00m x 3.15m using non-destructive cutting, 12.3 square metres

Demolition of internal masonry 10.90m x 2.95m

Clearing of a 0.2m concrete lintel

Demolition of a 1.60m x 1.15m concrete window sill

using non-destructive cutting, 3.9 square metres

Shredding, removal and transport of rubble

1st FLOOR

Demolition of concrete window sills 0.87m x 2.95m (2 pieces) using non-disruptive cutting, 9.2 square metres

Demolition of 20 cm concrete lintels

Demolition of concrete walls 3.00 m × 1.15 m using a diamond-tipped saw, 5.3 m²

Demolition of partition walls, 31.6 m²

Demolition of partition walls, 5 m²

Demolition of a concrete wall, 4.35 m × 2.95 m, using a non-destructive cutting method, 11.65 m²

Demolition of a ‘zigzag’ concrete beam, 7 square metres

Demolition of an external concrete wing, 7 metres × 0.50 metres, using a diamond-tipped saw, 7 square metres

Shredding, removal and transport of rubble

ROOF

Demolition of roof slabs

Shredding, removal and transport of rubble