Building in Evosmos

Project Details

Date 26/08/2019
Area Evosmos, Thessaloniki
  1. Roof dismantling (tiles – timber)
  2. Demolition of external perimeter walls (1.50m)
  3. Demolition of internal partition walls
  4. Removal and transport of rubble using chutes and a lifting machine
  5. Demolition of storage areas on the ground floor (walls – partition walls)
  6. Removal and transport of rubble