Railing on the roof terrace of a block of flats in Nea Smyrni

Project Details

Date 28/06/2019
Area Nea Smyrni, Athens

 

  1. Removal of parapets around the perimeter of the roof terrace (40m x 0.80m x 0.25m)
  2. Use of wire mesh and coarse burlap to retain debris in the ‘void’
  3. Removal and transport of demolition waste using a lifting machine