| Date | September 2024 |
| Location | Thessaloniki |
Dismantling of a 76.50 m² roof (tiles – timber)
Demolition of 80 m² of partition walls
Removal of 20 m² of wall tiles
Removal of floor tiles + gross area of 92 m²
Removal of floor slab 8 m² & excavation 2 m³
Removal of mezzanine railings & plasterboard partition wall 12.50 m
Demolition of façade (canopy – cladding – shop windows – external window frames)
Removal of awnings (2 units)
Collection and removal of demolition waste/rubble