HOTEL in CHALKIDIKI

Project Details

Date May 2024
Location Athens

28 Double Rooms

Removal of built-in wardrobe

Removal of plasterboard false ceiling in the hall

Demolition of bathroom (wall and floor tiles – not gross – sanitary ware –

15 m² of masonry – plasterboard false ceiling)

Removal of floor tiles + adhesive, 24 m² (not including grout)

Removal of internal window and door frames (2 items)

Disposal of demolition waste in the courtyard

2 four-bed rooms

Removal of built-in wardrobe

Removal of plasterboard false ceiling in the hall

Demolition of bathroom (wall and floor tiles – not gross – sanitary ware –

20 m² of masonry – plasterboard false ceiling)

Removal of floor tiles + adhesive, 29 m² (not including grout)

Removal of internal window and door frames (2 items)

Disposal of demolition waste/rubble in the courtyard

6 maisonettes (GROUND FLOOR – MEZZANINE)

Removal of floor tiles + adhesive (not gross)

Dismantling of built-in cupboards (2 units)

Dismantling of bathroom (wall and floor tiles – not gross –

sanitary ware – plasterboard false ceiling)

Dismantling of wooden flooring

Disposal of dismantled materials/rubble in the courtyard

9 Suites

Dismantling of built-in wardrobes (3 units)

Demolition of bathroom (wall and floor tiles – not including gross –

sanitary ware – plasterboard false ceiling)

Removal of floor tiles + adhesive (not including gross)

Dismantling of internal window and door frames (4 items)

Disposal of dismantled materials/rubble in the courtyard

EXTERIOR 45 Rooms

Removal of floor tiles + adhesive 360 m² (not gross)

Disposal of rubble in the courtyard

Mistral Restaurants

Removal of floor tiles + adhesive 208 m² (not gross)

Removal of wall tiles in the kitchen area

Removal of wall tiles on the columns

Removal of bathroom fixtures (wall tiles – floor tiles – sanitary ware)

Removal of wooden partition

Demolition of partition wall 5.00m x 2.80m

Removal of plasterboard false ceiling

Removal of external window and door frames (7 items)

Removal of internal window and door frames – doors (8 items)

Removal of floor tiles + adhesive ~180 m² in the outdoor area (not gross)

Removal of metal canopy

Removal of surface/floor tiles (mosaic) in the swimming pool (not gross)

Disposal of demolition waste/rubble in the courtyard

EXTRA WORK

Demolition (gross) of 208 m²

Disposal of rubble in the courtyard

5 SWIMMING POOLS

Removal of wall and floor tiles (mosaic) – not gross

Disposal of rubble in the courtyard