| Date | May 2024 |
| Location | Athens |
28 Double Rooms
Removal of built-in wardrobe
Removal of plasterboard false ceiling in the hall
Demolition of bathroom (wall and floor tiles – not gross – sanitary ware –
15 m² of masonry – plasterboard false ceiling)
Removal of floor tiles + adhesive, 24 m² (not including grout)
Removal of internal window and door frames (2 items)
Disposal of demolition waste in the courtyard
2 four-bed rooms
Removal of built-in wardrobe
Removal of plasterboard false ceiling in the hall
Demolition of bathroom (wall and floor tiles – not gross – sanitary ware –
20 m² of masonry – plasterboard false ceiling)
Removal of floor tiles + adhesive, 29 m² (not including grout)
Removal of internal window and door frames (2 items)
Disposal of demolition waste/rubble in the courtyard
6 maisonettes (GROUND FLOOR – MEZZANINE)
Removal of floor tiles + adhesive (not gross)
Dismantling of built-in cupboards (2 units)
Dismantling of bathroom (wall and floor tiles – not gross –
sanitary ware – plasterboard false ceiling)
Dismantling of wooden flooring
Disposal of dismantled materials/rubble in the courtyard
9 Suites
Dismantling of built-in wardrobes (3 units)
Demolition of bathroom (wall and floor tiles – not including gross –
sanitary ware – plasterboard false ceiling)
Removal of floor tiles + adhesive (not including gross)
Dismantling of internal window and door frames (4 items)
Disposal of dismantled materials/rubble in the courtyard
EXTERIOR 45 Rooms
Removal of floor tiles + adhesive 360 m² (not gross)
Disposal of rubble in the courtyard
Mistral Restaurants
Removal of floor tiles + adhesive 208 m² (not gross)
Removal of wall tiles in the kitchen area
Removal of wall tiles on the columns
Removal of bathroom fixtures (wall tiles – floor tiles – sanitary ware)
Removal of wooden partition
Demolition of partition wall 5.00m x 2.80m
Removal of plasterboard false ceiling
Removal of external window and door frames (7 items)
Removal of internal window and door frames – doors (8 items)
Removal of floor tiles + adhesive ~180 m² in the outdoor area (not gross)
Removal of metal canopy
Removal of surface/floor tiles (mosaic) in the swimming pool (not gross)
Disposal of demolition waste/rubble in the courtyard
EXTRA WORK
Demolition (gross) of 208 m²
Disposal of rubble in the courtyard
5 SWIMMING POOLS
Removal of wall and floor tiles (mosaic) – not gross
Disposal of rubble in the courtyard